ETUAL engineering company
Comprehensive engineering solutions for Your business
From concept to start-up

Being at the market since 1997, we have managed to build a team of highly-qualified specialists in design, construction, installation and service of industrial buildings. ETUAL core target is project investment cycle reduction and as a result - reduction of Client total investment costs.

Optimal project solution negotiation

ETUAL will advise on production technology and equipment suppliers. We'll help to find an optimal land lot concerning Your industrial logistic and resources supply (water, sewage, power, gas etc.)

General project designer

General design with further assistance in Expertise procedure and permit system, site management, detailed Work Schedule - core points in ETUAL work concept.

Construction

Special internal sub-constructing structure saves time and Client costs. ETUAL can easily do the construction on project developed by other company.

Licensed software design

Designing of all metal structures - is one of our main specializations. Our high-qualified specialists will develop all engineering documentation, from the moment of obtaining technical task to delivery of complete set of drawings for constructions production.

Delivery

Prompt materials delivery is very important in construction. Our staff guarantees that the delivery will be carried out by optimal route from the production to the Client site.

Installation and mounting

Installation works proper organization is the guarantee of quality in construction. To assure compliance with the agreed project, the installation and mounting are performed by the designer.

Quality guarantee

For more than 20 years ETUAL is considered to be one of the leaders at Ukraine construction market and is reliable partner for Ukrainian and European companies.

Service maintenance

ETUAL offers service maintenance of the object. We will consult regarding any technical issues of Your project.

Field supervision

Project designer controls conformity of construction works with project, working and tender documentation.

ETUAL

specialization

Our metalwork
For more than 20 years ETUAL is doing design, production, installation and service of all metalwork in compliance with European quality standards
Ventilation
Industrial ventilation, aspiration and microclimate - are complicated processes, but You can trust their design, installation, service and start-up to ETUAL specialists
Electric cabinets
ETUAL is doing design, production, installation and service of all switchboards in compliance with European quality standards
Seed production plant, Stasi, Poltava region

Crop seeds conditioning complex construction, after-effect class СС2


Client: Stasi Nasinnia LLC (DuPont Pioneer Ukraine)

Construction site address: Yabluneva street, 3, Stasi, Dykanka district, Poltava region


Scope of works fulfilled by ETUAL: 

primary data collection and obtaining all necessary permits (on Client instructions) General project designer, project Expertise accompaniment General constructor production and mounting of Steel Structures field supervisor

Project description:

Plant provides full production cycle for corn and sunflower seeds, including: cob intake, husking, sorting, cobs drying, shelling preliminary cleaning, conditioning (sizing), treating, bagging and storage.

Production capacity:

corn seeds - 10 000 tons/year sunflower seeds - 2 000 tons/year

Client web-site: https://www.pioneer.com/

Links about the plant:

https://latifundist.com/ http://www.zerno-ua.com/ https://latifundist.com/

 

 

read more
Lebedyn Seed Plant

Crop seeds conditioning complex construction, corn cob intake and drying, cob cleaning, reconstruction of seed dryer, after-effect class СС2


Client: LNZ Group

Construction site address: Zavodska street, 17, Lebedyn, Shpola district, Cherkasy region


Scope of works fulfilled by ETUAL:

General project designer General contractor (incl. construction) installation of technological equipment production and mounting of Steel Structures

Project description:

Plant provides full production cycle for corn and sunflower seeds, including: cob intake, husking, sorting, cobs drying, shelling preliminary cleaning, conditioning (sizing), treating, bagging and storage. Calibration line sizes the seed into four fractions. Plant laboratory controls the seed quality at intake and at all production stages The equipment of  world-known producers is installed at the plant: PETCUS, A&K Development Company, Tecflam, IPE Steuerungstechnik, KAMAS Westrup, Simotec.

Production capacity:

seed production - 330 tons/day area under construction – 2 600 sq.m.

Client web-site:   lnz.com.ua

About the plant:     mais

                                   multigrain

 

Publications in Internet: zerno-ua.com

read more
Grain Silo

Construction of Grain Silo, capacity 77 000 tons, after-effect class СС2


Client: BK Megapolis (LNZ Group)

Construction site address: Vorozhbianskyi Shliah, 58, Bilopillia, Sumska region


Scope of works fulfilled by ETUAL: 

General Contractor (incl. construction) production and mounting of steel structures installation of  PETKUS technological equipment

Project description:

Reloading and transfer terminal consisting of:  

intake of cereal and oil crops at two truck unloading stations (simultaneously) cleaning of crop laboratory control cereal and oil crop dryers storage in 12 silos with capacity 5 500 tons each shipment of cereal and oil crops to railway and trucks.

Production capacities:  

corn dryer - 200 tons/hour cleaning - 600+500 tons/hour transportation - 250 tons/hour intake from vehicle - 8 500 tons/day intake from railway - 1 500 tons/day shipment to vehicle - 500 tons/day shipment to railway - 3 500 tons/day

Client web-site:    lnz.com.ua

Information on Internet: latifundist.com

read more
Soybean extracting plant, Adampil

Construction of soybean processing oil extracting plant, after-effect class СС3


Client: Elevator BudInvest LLC

Construction site address: Starokostiantynivske road, 2, Adampil, Starosyniavsky district, Khmelnytsky region


Scope of works fulfilled by ETUAL: 

development of working documentation production and mounting of steel structures

Project description:

The plant crushes soybeans and processes it into soybean oil, feeding high-protein toasted meal, granulated soy shell and lecithin. Technology includes the following stages: weighing, beans cleaning and conditioning, shelling and husking, milling, extraction, absorption and hydration. The plant also includes silo storage and storage capacities for finished goods, as well as the necessary engineering, road and rail communications.

Thanks to modern technologies, the plant is a closed cycle, that is - there is no waste. The complex is equipped by leading manufacturers and all equipment is certified in accordance with international standards. The plant is situated at only 6 hectares and has ideal logistics.

Production capacities:  

soybean crushing capacity – 1 500 tons/day high-protein toasted meal - 330 000 tons/year soybean oil - 80 000 tons/year granulated soybean shell - 20 000 tons/year silo storage capacity – 21 900 tons

Information on Internet:  

latifundist.com starosynjavska-gromada.gov.ua 33tv.com.ua decentralization.gov.ua
read more
Soybean extracting plant, Hlobyne

Construction of soybean processing oil extracting plant, after-effect class СС3


Client: ASTARTA-KYIV

Construction site address: Karla Marksa street, 203, Hlobyne, Poltava region


Scope of works fulfilled by ETUAL: 

General project designer   General Contractor (incl. construction) Production and mounting of steel structures

Project description:

Integrated soybean processing plant was put into operation in early 2014. The plant crushes soybeans and processes it into feeding high-protein toasted meal, soybean oil and granulated soy shell. The plant also includes silo storage and storage capacities for finished goods, as well as the necessary engineering, road and rail communications.

Plant is successfully integrated into the production cycle of ASTARTA Holding and has high level of self-sufficiency in raw materials. The complex is equipped by leading manufacturers and all equipment is certified in accordance with international standards. High production water and air treatment systems are installed at the plant.

Production of high quality goods is one of ASTARTA’s top priorities. Soybean processing plant has high quality control system to monitor all stages of production process - from acceptance of soybean through production of finished products, as well as adherence to high environmental standards and requirements.

Plant finished goods - soybean meal, soybean hydrated oil and granulated soybean shell – have already gained high ranks among domestic and international producers of poultry, livestock and aquaculture products.

Production capacities:  

soybean crushing capacity – 700 tons/day or 220 000 tons/year high-protein toasted meal - 160 000 tons/year soybean oil - 40 000 tons/year granulated soybean shell - 10 000 tons/year silo storage capacity – 42 000 tons area under construction – 7 000 sq.m.

Client web-site:   startaholding.com         

About the plant at the Client's site:           plant

Information on Internet:

wikipedia.org how ASTARTA proceed soy beans in Hlobyne latifundist.com

 

read more
Pryluky Tobacco Factory

Production and office construction, Tobacco Factory in Pryluky


Client: Private JSC "A/T Tobacco Company “B.A.T.-Pryluky”

(British American Tobacco Ukraine)

Construction site address: Nezalezhnosti street, 21, Pryluky, Chernihiv region


Scope of works fulfilled by ETUAL:

General project designer project Expertise accompaniment General Contractor (incl. construction) production and mounting of Steel Structures field supervision

Project description:

Construction included: new finished products warehouse, modern energy centre, office building, cigarette workshop, factory territory increment. The modern production lines produce the products of world quality level.

Pryluky Tobacco Factory produces more than 10 cigarette brands. Cigarettes are exported to Belorussia, Armenia, Georgia, Moldova, Azerbaijan and Singapore. Tobacco and cigarette workshops include the main production stages: from preliminary tobacco treatment to cigarette packing.

Area under construction - 16 409 sq.m.


Client web-site:    

http://www.bat.ua     http://www.bat.com

About the Factory:       http://www.bat.ua

read more
Kremenchuk Tobacco Factory

Production and office construction of Kremenchuk Tobacco Factory. Construction of tobacco raw materials warehouse.


Client: JSC "JT International Company Ukraine"

(Japan Tobacco International Ukraine)

Construction site address: 1905 year street, 19, Kremenchuk, Poltava region


Scope of works fulfilled by ETUAL:

development of Working documentation General Contractor (incl. construction) production and mounting of Steel Structures

Project description:

Construction of cigarette section, auxiliary production and service building, tobacco and cut tobacco warehouse, cigarette filter production workshop and administrative building.

Increasing of cigarette production volume:

for 6,3 BIO cig./year  

Production volume:

16,3 BIO cig./year

Client web-site:    https://www.jti.com      

Links about the plant:  https://uk.wikipedia.org

read more
Ceramic granite and tile production plant

Construction of production and warehouse buildings of ceramic granite and tile production plant ATEM 

Client: ATEM group of companies (ATEM LLC / KERAMIN LLC)

Construction site address: Promyslova street, 4-B, Kiev


Scope of works fulfilled by ETUAL:

development of Working documentation General Contractor (incl. construction) production and mounting of Steel Structures

Project description:

The first lot of ceramic tile was produced in May 2003, and today plant is equipped with eight automatic production lines. ATEM plant – integrated, fully automatized production starting from preparation of mixture to tile packing. More than 100 mio USD was invested in construction,  modernization and developing of production capacities. Technical equipment for the plant was provided by international leaders of equipment production, namely by SACMI, SYSTEM, SITI, KEMAC and TECHNOITALIA and others. Multi-purpose ATEM equipment give the possibility to produce the wide range of products, including: wall and floor tile, borders, decorative components, ceramic granite, dimensional frieze and small-sized tile.

Production capacity:

production area - 120 000 sq.m. ceramic and porcelain tiles - over 22 million sq.m./year that is of Ukraine overall ceramic and porcelain tile production  - 33%

Client web-site:    https://atem.com.ua

read more
Poltava Confectionary

Reconstruction and reshaping of unfinished construction into confectionary production facility. Chocolate section and finished goods warehouse


Client:  Private JSC "Poltavakonditer" (SigmaBleyzer LLC, group of funds)

Construction site address: Marshala Biriuzova street, 2, Poltava


Scope of works fulfilled by ETUAL :

development of Working documentation General Contractor (incl. construction) production and mounting of Steel Structures installation of technological equipment  

Project description:

Confectionary consisting of floury and chocolate workshops. Floury production is equipped with LASER Italian lines on sugar, fruit-filled and rich biscuits production and snack products. Chocolate workshop is equipped with two BUHLER Swiss lines on chocolate masses and  chocolate bricks production.

Reconstruction of chocolate section foresaw installation of three lines for chocolate sweets and hollow-centered  chocolate figures production. Reconstruction was aimed to increase the assortment. Construction of high-rise warehouse meets the need of owned storage facilities and storage of finished goods at required temperature conditions.

Projected production capacity:

biscuits production  -  48 tons/day sunflower seeds - 30 tons/day storage capacity – 1 500 tons of finished goods warehouse area – 3 500 sq.m.

Client web-site:

dominik.ua      sigmableyzer.com    

Web publications:

poltava365.com news.liga.net
read more
Poltava meat-processing plant

Construction of Poltava meat-processing plant


Client: POLAGROSERVIS LLC  (Yasni Zori / Belgrankorm-Poltavshchyna / Gullinburs)

Construction site address: Horuzhi, Reshetylivka district, Poltava region


Scope of works fulfilled by ETUAL:

General project designer General Contractor (incl. construction) production and mounting of Steel Structures installation of technological equipment VORAN, ALSE, BANSS, GEA Grasso, SCHALLER LEBENSMITTELTECHNIK, ECOLAB

Project description:

Complex is foreseen for cattle slaughter and processing, including: cattle intake, slaughter, slaughter products processing, meat cooling, boning, meat selling in half-carcasses, quarters, boned packed meat.

Production capacity:

swine slaughter -  30 tons/day cattle slaughter - 40 tons/day pork meat production - 6 tons/day beef meat production  - 6 tons/day

Links about the plant: apk-inform.com

read more
Office & warehouse complex

G.C. HAHN & Co. office and warehouse complex construction


Client: G.C. Hahn & Co. Kіev, Tate & Lyle Food Systems

Construction site address: Zentralna street, 2-В, Mala Oleksandrivka, Boryspil district, Kiev region


Scope of works fulfilled by ETUAL:

development of Working documentation General Contractor (incl. construction) production and mounting of Steel Structures

Project description:

Office and warehouse complex designed for intake, storage and selling of food additives and stabilization systems for food production.

At Tate & Lyle Food Systems, developing food stabilizer solutions with cost reduction and cleaner label options is our top priority. Tate & Lyle Food Systems formulate special food systems for products with clearly defined requirements on the product declaration. Combining suitable ingredients with high functionality can meet targeted declaration ranging from “clean(er) label” to “free-from” egg, wheat and more – with little or no compromise on quality, and the benefits of cost-effectiveness.

Total area – 1 301,8 sq.m., incl.:

office building - 590,0 sq.m. warehouse storage - 711,8 sq.m.

Client web-site:   

tateandlyle.com        yourfoodsystems.com

 

read more
Cherkasy Seed Plant

Seed conditioning workshop and storage warehouse construction


Client: MAIS LLC, Group of companies

Construction site address: Surikova street, 12/5, Cherkasy


Scope of works fulfilled by ETUAL:

development of Working documentation   General constructor production and mounting of Steel Structures production and mounting of technological bunkers  

Project description:

Sizing workshop is functioning in frames of corn seed production plant and provides the following production cycle: husking, conditioning (sizing), photoseparator sorting, treating, packing in bags or BigBags, warehouse storage.

Production capacity:

sizing line - 6 000-8 000 tons/hour warehouse storage capacity - 2 800 tons/seeds

Client web-site: mais.ua

Links about the plant:  www.youtube.com  

read more
NIBULON Silo Terminal

Construction of reloading terminal with shipment of cereal and oil crops to river transport

Client: NIBULON LLC  

Construction site address: Promyslova street, 1, Kamyanka-Dniprovs’ka, Zaporizhzhia region

Scope of works fulfilled by ETUAL:

General project designer project Expertise accompaniment field supervision   

 

Project description:

Reloading terminal is designed to intake cereal and oil crops at two truck unloaders simultaneously, and includes cleaning and lab control, drying of cereal and oil crops in seed dryers, storage in 12 silos with capacity of 5500 tons each, shipment of cereal and oil crops to river and vehicle transport. Terminal is equipped with high-capacity transport equipment.

Capacity:

total area – 37 860 sq.m.      total storage capacity - 66 000 tons of grain   annual programme - 100 000 tons of grain /daily  programme - 8 000 tons of grain transportation capacity - 250 tons/hour

 

Client web-site:   nibulon.com

read more
OBOLON Brewery

Construction of Industrial premises: cylinder-conic tanks building, canned bier workshop

Client: OBOLON Private Joint Stock Company

Construction site address: Kyiv, Bohatyrs’ka, 3

Scope of works fulfilled by ETUAL:  

Work Project Development   General Contractor (incl. construction)

 

Client web-site:       http://obolon.ua/ua

read more
Гаврилівські Курчата

Client: Complex AGROMARS Company 

Address of the construction site: Gavrylivka, Kyiv region

 

read more
Bioethanol plant

Bioethanol production plant (from corn), GEA Wiegand technology


Client: KoronAgro LLC

Construction site address: Chervonopraporna street, 20, Zolotonosha, Cherkasy region


Scope of works fulfilled by ETUAL: 

primary data collection and obtaining all necessary permits (on Client instructions) development of Working Documentation project Expertise accompaniment General Contractor (incl. construction) production and mounting of Steel Structures GEA Wiegand technical equipment installation

Project description:

Plant will process corn into bioethanol and fodder products (DDGS). Bioethanol – alternative ecologically clean fuel for motortransport.

Production capacity:

corn processing - 350 000 tons/year bioethanol production – 100 000 tons/year DDGS – 105 824 tons/year area under construction – 37 860 sq.m.

Links about the plant:

gazeta.ua news.finance.ua
read more
MacCoffee plant

Construction of production and warehouse building, re-equipment of instant beverages plant.  


Client: FES-UKR LLC  (Food Empire Singapore)

Construction site address: Shevchenka street, 235A, Zolotonosha, Cherkasy region


Scope of works fulfilled by ETUAL: 

General project designer General constructor production and mounting of Steel Structures field supervisor

Project description:

Warehouse storages dry packed coffee beverages and raw materials.

Production capacity:

instant beverages – up to 70 tons/day area under construction – 3 163,5 sq.m.

Client web-site:

ua.all.biz foodempire.com

 

TM web-site: 

maccoffee.com.ua petrovskaya.foodempire.ru 3in1.com.ua

Links about the plant: procherk.info

read more
Warehouse for Kievtransexpedition

Production and warehouse building


Client: Kievtransexpedition

Construction site address: Akademika Tupoleva street, 23, Kiev


Scope of works fulfilled by ETUAL:   

General project designer General constructor production and mounting of Steel Structures field supervisor

Production and warehouse building includes:

- intake of goods, that require special storage climate

- fridge storage

- storage

- sorting

- packaging

- shipment of goods

area under construction - 1 485,8 sq.m.

Client web-site:    kte.org.ua

read more
Logistic and warehouse complex

Logistic and warehouse complex


Client: INTEREUROPA-Ukraine LLC 

Construction site address: Dymytrovo, Brovary district, Kiev region


Scope of works fulfilled by ETUAL:

primary data collection and obtaining all necessary permits (on Client instructions) General project designer project Expertise accompaniment

Project description:

Complex is projected to intake, store at high rack stand and sell non-food goods in packed certain number of pieces (store shelves warehousing). Open-air parking lot can allocate up to 2500 vehicles for presale storage.

warehouse capacity – 5 000 tons total area under construction – 11 556,6 sq.m., including   office building – 1 167,1 sq.m. warehouse – 10 389,5 sq.m.

Client web-site:

tek-zts.com.ua  intereuropa.si g.co
read more
Contact Us
ETUAL LLC 1, Bortnytska street, Petropavlivske, Boryspil district, Kyiv region, 08316, Ukraine
+38-050-305-92-68
+38-044-331-92-00
факс: +38-053-250-96-67